Client
ZIC
Location
Venezuela
The Challenge
Heavy Lift operations in Lake Maracaibo: perform all inspections and tests to achieve the lifting and transfer to land of the PCTJ-4 compression module "C" in Lake Maracaibo.
The DICCA Solution
Damage assessment of the compression train. This included the engineering analyses associated with the dismantling, lifting, relocation of the module to the ground, and its return to its original location.
The Impact
Results
The turbine and compressor section of module C was successfully disconnected, and then lifted and moved to land.
Scope of work
Develop Phase 1 Engineering for the reconstruction of Module "C", including the Heavy Lift operations on Lake Maracaibo
A project like EPC Module "C" Tía Juana Compressor Plant 4?
Let's talk about how our engineering, procurement, and construction experience can make it happen.